Windows/SQL 2008 Migration: 3-Week Implementation

atQor

This Migration implementation is focused on moving applications running on End-Of-Life-Support legacy Windows server 2008 and SQL Server 2008 products into Azure.

This 1 week implementation atQor will provide a strategic and efficient migration of your legacy Windows or SQL workload to Azure. This will benefit from any cyberattacks including an additional 3 years of critical security updates beyond end of life (requires a migration for SQL Server to Azure SQL Database managed instances or Azure VMs), improved resiliency and performance from the Azure platform, and additional savings.

This Implementation will include:

Analysis of legacy EOL servers. Upgradation of the legacy servers. Strategic Migration process. pre and Post validation for smooth migration process. Application and Database Schema validation.

Deliverables included:

Fully functional environment. Training and walkthrough. Post Migration architecture design document.

https://store-images.s-microsoft.com/image/apps.41297.a047a798-a3ff-4678-9d32-a26109f9f081.1b0c51fc-8f57-4d52-9867-a341f0efebf3.427d46cd-d1bf-4fec-af8d-1e448f9de10c
https://store-images.s-microsoft.com/image/apps.41297.a047a798-a3ff-4678-9d32-a26109f9f081.1b0c51fc-8f57-4d52-9867-a341f0efebf3.427d46cd-d1bf-4fec-af8d-1e448f9de10c
https://store-images.s-microsoft.com/image/apps.30723.a047a798-a3ff-4678-9d32-a26109f9f081.2d247121-fa41-4fa8-bca5-ab368661b8a4.4694b1cf-54bc-4b4e-88b4-49255bd206c1
https://store-images.s-microsoft.com/image/apps.38404.a047a798-a3ff-4678-9d32-a26109f9f081.2d247121-fa41-4fa8-bca5-ab368661b8a4.2a398c03-1bd3-4202-a652-93c964e7530a