https://store-images.s-microsoft.com/image/apps.23080.457cf7fe-9dd0-4c12-8dd3-7a4a0b42267f.2df7ed8d-6ce3-415d-8c01-191d1f0fff05.6245e86e-3fb6-4c44-9d9f-f2b1511f31c9

ChainSys Data Migration for SAP CX Cloud

Chainsys

ChainSys Data Migration for SAP CX Cloud

Chainsys

Migrate master, reference, and transactional data from any source to SAP CX Cloud (Sales, Marketing,

Solution Description

ChainSys Smart Data Platform and proven methodology ensure your data migration success from your current system to your new SAP CX Cloud system, in as little as one-third the time. Trust ChainSys Smart Data Platform to deliver your next critical data migration project.


Use Cases, Key Features and Highlights

    • Migrate master, reference, and transaction data from any source to SAP CX Cloud.
    • Consolidate multiple source systems and/or subsystems onto a single SAP CX Cloud instance.
    • Support mergers, acquisitions, and divestitures in SAP CX Cloud.
    • Bifurcate a single SAP CX Cloud instance into multiple instances.
    • Inline data profiling and improved data quality
    • Inline master data deduping, cleansing, enrichment
    • Inline data pre- and post-load validation
    • End-to-end data lineage and reconciliation
    • Parallel processing

                  Why ChainSys

                  • Reduced Migration Project Risk and Timeline
                  • Smooth Cutovers with Reduced Cutover Time
                  • Satisfied Auditors

                      ChainSys Approach

                      ChainSys Smart Data Platform leverages pre-built object-level extract adaptors for most common enterprise applications, as well as pre-built object-level load adaptors to SAP CX Cloud, to accelerate your extraction, mapping, transformation, and loading.


                      ChainSys Smart Data Platform rapidly extracts master, reference, and transactional data to assess and profile it, then configurable business rules are applied to match, merge, cleanse and enrich each data object as part of its data flow. Each data flow is then orchestrated to execute sequentially or in parallel, as required by the target system. Source data objects are loaded into the ChainSys data mart for pre-validation, transformation, corrections, before final loading into the target. End-to-end orchestrated data migrations (test cycles) are typically performed 3 to 5 times, prior to production cutover. With an increased number of test cycles and the first test cycle happening as early as one month into the data migration effort, the data quality improves significantly from one test cycle to the next. Full end-to-end data reconciliation of all data sources to all targets is performed with each iteration.


                      https://store-images.s-microsoft.com/image/apps.33755.457cf7fe-9dd0-4c12-8dd3-7a4a0b42267f.2df7ed8d-6ce3-415d-8c01-191d1f0fff05.1a9a5270-ee2b-41f4-afc2-a7384ce1ac38
                      https://store-images.s-microsoft.com/image/apps.33755.457cf7fe-9dd0-4c12-8dd3-7a4a0b42267f.2df7ed8d-6ce3-415d-8c01-191d1f0fff05.1a9a5270-ee2b-41f4-afc2-a7384ce1ac38
                      https://store-images.s-microsoft.com/image/apps.61044.457cf7fe-9dd0-4c12-8dd3-7a4a0b42267f.2df7ed8d-6ce3-415d-8c01-191d1f0fff05.189d2036-a1be-4e3e-87e7-d7a0f8c63f2f